4th Mountain Trail Re-Lo Project

Please join us on October 9th for a fall work trip to relocate part of the AT on Fourth Mountain. The present location is steep, severely eroded in places, and considered to be too expensive to bring it back to proper conditions. This relocation is approximately 1 mile long and circumvents the peak of Fourth Mountain (there was no view anyhow). Both sawyers (felling certification not required) and swampers are needed. Swampers will be clearing undergrowth with hand tools like loppers and handsaws. The plan is to meet up in the morning at the KI gate, drive to the Fourth […]

Read More
White Brook Trail Work Trip

CANCELLED- 4th Mountain Trail Re-Lo Project

CANCELLED- Rescheduled for October 9th! Please join us on September 25th (rain date September 26th) for a fall work trip to relocate part of the AT on Fourth Mountain. The present location is steep, severely eroded in places, and considered to be too expensive to bring it back to proper conditions. This relocation is approximately 1 mile long and circumvents the peak of Fourth Mountain (there was no view anyhow). Both sawyers (felling certification not required) and swampers are needed. Swampers will be clearing undergrowth with hand tools like loppers and handsaws. The plan is to meet up in the […]

Read More

Long Pond Stream Lean-to Rear Sill Replacement

A straight forward rear-sill replacement after a few hours of digging out rear side hill. Dirt will be utilized to improve several earthen tent sites nearby. Harden the rear side hill and channel water away from rear of structure. We’ll also be covering the rotted ends of the Deacon’s seat log. 6-8 volunteers are needed.

Read More