Volunteers are needed on Mondays, Tuesdays, and/or Wednesdays during the first three weeks of June (June 1–3, 8–10, and 15–17). Work will include: Hiking tools and materials in and out of the site Setting up rigging systems Operating Griphoists Timber preparation Bridge demolition This is a physically demanding project that involves strenuous hiking and heavy […]
The Spaulding Mountain campsite is getting a new privy, and we need your help! On June 6 (rain date June 7) we'll do the site prep which will involve felling some trees and digging to get a flat surface. Access involves about 3.4 miles of hiking with 1,250 feet elevation gain.
This day-long event will be a great introduction to what's involved with trail maintenance on the AT. It will take place on Little Boardman Mountain over easy terrain. Contact Janice for more information.
Volunteers are needed on Mondays, Tuesdays, and/or Wednesdays during the first three weeks of June (June 1–3, 8–10, and 15–17). Work will include: Hiking tools and materials in and out of the site Setting up rigging systems Operating Griphoists Timber preparation Bridge demolition This is a physically demanding project that involves strenuous hiking and heavy […]
The Safford Notch campsite is getting a new privy, and we need your help! On June 14 we'll do the site prep which will involve felling some trees and digging to get a flat surface. Access involves about 2.3 miles of hiking with 1,225 feet elevation gain.
Help our trail crew gear up for their next backcountry project! On this single-day trip, we’ll hike into the Holly Brook area with tools and equipment, then set up a base camp for the crew where they'll stay for their multi-day "hitch.". It’s a fun, hands‑on way to experience the behind‑the‑scenes work that makes trail […]
Volunteers are needed on Mondays, Tuesdays, and/or Wednesdays during the first three weeks of June (June 1–3, 8–10, and 15–17). Work will include: Hiking tools and materials in and out of the site Setting up rigging systems Operating Griphoists Timber preparation Bridge demolition This is a physically demanding project that involves strenuous hiking and heavy […]
Our summer ridge-runner is setting up their "home" for the season, and we need some help getting in supplies and equipment. Contact Janice for more information.
A bunch of materials are being flow out of the Horns Pond campsite later this summer. We need help bundling these materials to be helicoptered out in August. Access is a 4.5 mile hike with 2,000 feet of elevation gain. We'll be carrying heavy-duty ratchet straps, slings, and burlap bags to prepare the materials as […]
The Maine Trail Crew repairs steep, rugged, and degraded sections of the Appalachian Trail, helping to protect and preserve this treasured resource for future generations. Volunteers (18+) are invited to apply to join our paid crew for one or more of the following sessions: June 29 – July 3; July 6 – July 10; July […]